Drilling fluid (often called "mud") is used to:
- lift soil/rock cuttings from the bottom of the borehole and carry them to a settling pit.
- allow cuttings to drop out in the mud pit so that they are not re-circulated
(influenced by mud thickness, flow rate in the settling pits and shape/size of the pits).
- prevent cuttings from rapidly settling while another length of drill pipe is being added
(if cuttings drop too fast, they can build-up on top of the bit and seize it in the hole).
- create a film of small particles on the borehole wall to prevent caving and to ensure that
the upward-flowing stream of drilling fluid does not erode the adjacent formation.
- seal the borehole wall to reduce fluid loss (minimizing volumes of drilling fluid is
especially important in dry areas where water must be carried from far away).
- cool and clean the drill bit.
- lubricate the bit, bearings, mud pump and drill pipe.
Always start drilling with clean water as the drilling fluid; keep it as clean as possible during drilling to minimize
subsequent well development problems. In clay-rich formations, the water will quickly mix with natural clays in the
borehole to form a thin clay slurry. While this "natural mud" can be used for drilling the first few meters, it should be
replaced with clean water or a drilling mud prior to the water bearing zones being reached. If this is not done,
the natural clays will be pushed into the aquifer and will not break-down with development, thus seriously restricting
borehole yield.
In sandy soils, EeZee Mud must be mixed with the drilling water to increase its viscosity
and keep the borehole from collapsing (just a small amount of EeZee Mud is required). While better than natural clays,
bentonite does not readily break down its cohesive structure and it can be difficult to remove from the borehole and
aquifer. Since this can keep boreholes from reaching their potential yield, it can be adventageous to use synthetic
muds (polymers) such as ViscoGel when drilling into marginal aquifers. Because it is a very concentrated
polymer and can be shipped at relatively low cost.
Whenever using synthetic drilling polymers, however, it is extremely important to flush all the polymer out of the
borehole as soon as possible. Some polymers have an organic base which can act as a bacterial food source.
If left in the borehole, nuisance and health-related bacterial populations can grow rapidly and permamently affect the
taste, odour and safety of the borehole. To avoid these problems, flush as much polymer out of the borehole as possible
before floating in the gravel pack. Break-down can be enhanced by adding 500 to 1,000 ppm chlorine to the drilling fluid
during the flushing process.
If bentonite or polymer is not available, it is best to determine (from the government or other knowledgeable
organization) where there is a good supply of clay suitable for drilling (one that is relatively pure and has little or
no sand). Make sure that you evaluate the suitability of local clays prior to drilling with them.
Drilling mud is created by thoroughly mixing water with EeZee Mud and or ViscoGel to a desired consistency.
Pumping water through the by-pass hose on the 3-way valve and recirculating water back through the pits will help ensure that the clay and water are
thoroughly mixed. After the fluid is mixed, sufficient time must be allowed to elapse to
insure complete hydration of the EeZee Mud prior to it being circulated into the hole. If this is not done, the clays may swell in the hole or in the
aquifer itself. If this happens, it may be impossible to remove them after the casing is installed and the borehole may
never reach its potential yield.
Drilling fluids must be mixed thick (viscous) enough to bring soil cuttings up from the bottom of the hole to the
surface, yet not so viscous as to prevent their settling out in the mud pits. It is, therefore, very important to
understand the properties of drilling muds and their proper use.
The ability of a fluid to lift cuttings increases rapidly as viscosity (the degree to which a fluid resists flow under
an applied force) and up-hole velocity are increased. After cuttings are brought to the surface, however, it is
essential that they drop out as the fluid flows through the settling pit. The desired results are obtained by properly
designing the mud pits, controlling the viscosity and weight of the drilling fluid and adjusting the pump speed.
During the drilling process, solids accumulate in the drilling fluid - especially when drilling silt, clay or weakly
consolidated shale. The thickness of the drilling fluid often needs to be adjusted during drilling by adding more water
and/or removing some of the accumulated cuttings from the settling pit.
Fluid which is too thick will be difficult to pump and will cause unnecessary wear of the mud pump since cuttings will
not have settled out of the mud before the mud is pumped back down the borehole. It will also make it difficult to remove
the mud from the borehole walls and adjacent aquifer during well development. The rate of penetration is also potentially
reduced.
If the mud is too thin, cuttings will not be brought to the surface and the drill bit and drill pipe may get stuck in the
borehole by settling cuttings. In addition, thin mud can result in excessive migration of mud into the formation, thus
decreasing the potential yield of the well.
Once the well is started and the fluid is being pumped, it is important to keep the well and mud pits full of water
and complete the drilling and installation of the casing before the well is allowed to run out of water from the
drilling process.
If return circulation of drilling fluid out of the borehole is suddenly lost, ensure that you take immediate action. If
drilling stops for more than a few minutes and the water recedes down the hole, the well may cave-in! To minimize caving
risk, keep the drill rod in the well (several metres off the bottom) and re-fill the well through the drill pipe.
DO NOT pour water down the open hole since this may actually cause a cave-in! If the drilling stoppage lasts long,
pull the drill pipe out of the borehole to ensure it is not jammed and lost.